


I had to buy one more box of contractor bags and a few vacuum bags for 40 bucks. Total cost of the project is now up to $86.79.
Every time wifey and I embark on a project together, whether it's dicing vegetables or painting a room, there comes a time when I realize that wifey is progressing about as quickly as a drunken turtle. Today my investigation revealed that wifey was not pulling nails and letting them fall on the floor like a normal person. She was collecting them in a small basket. I don't even know where she got the damned basket. Who brings a little basket to a job site?
No comments:
Post a Comment